Tanjung Kidurong Combined-Cycle Gas-Fired Power Plant Expansion

power

Cost

$0.7b
$704,500,000

operational

2022

Capacity

1k
MW Electricity

Description

Construction of two combined-cycle gas-turbine blocks at the existing Tanjung Kidurong power station, with a current gross capacity of 842 MW, subsea cooling-water pipelines, a gas-insulated substation and a 275 kV grid connection.

Finance

logo
$100m loan
China Development Bank
Development bank

Contractors

Governing authorities