Nam Ngiep 2 Hydropower Plant

power

Cost

$345m
$345,000,000

operational

2015

Capacity

180
MW Electricity

Description

Construction of a 180 MW hydropower scheme with a transfer weir, 7.4 km transfer tunnel, 70 m rockfill dam, 10.9 km headrace tunnel, three 60 MW turbines and a 230 kV transmission connection to the Tha Vieng substation.

Finance

logo
$242.7m loan
China Development Bank
Development bank

Governing authorities

Menu