Huadian Sihanoukville 700 MW Coal-Fired Power Plant

power

Cost

$1.3b
$1,283,000,000

operational

2022

Capacity

1k
MW Electricity

Description

Construction of a 700 MW supercritical coal-fired power plant comprising two 350 MW units, an 8,000-tonne coal berth and a 1.5 km 230 kV transmission connection. The plant was developed under a 35-year BOOT concession.